iPC 2.5 is packed with new features that take your production to the next level.
Whenever a job is updated, the ‘estimated production time’ is recalculated and presented in a few seconds. This way, operators can see the effect on performance when they, for instance, optimize curve geometry or try different tools and tool parameters.
To simplify the setup of Feeder & Stacker configurations a number of improvements are added.
Sign up to our newsletter and stay up-to-date with current events.